Journals Information
Civil Engineering and Architecture Vol. 10(5), pp. 2054 - 2064
DOI: 10.13189/cea.2022.100526
Reprint (PDF) (963Kb)
Impact Curing Time and Compaction Methods to the Performance of Hot Mix Asphalt Asbuton
I Dewa Made Alit Karyawan *, Ratna Yuniarti , Desi Widianty , Hasyim , Mudji Wahyudi
Department of Civil Engineering, Faculty of Engineering, University of Mataram, Mataram, 83115, West Nusa Tenggara, Indonesia
ABSTRACT
Asbuton is rock asphalt located on Buton Island, Indonesia. The contained asphalt is hard and produces very high viscosities, making it very difficult to facilitate uniform coating of aggregates and to bind asphalt mixtures. These challenges in the process of incorporating Asbuton in asphalt mixtures make it less popular than the petroleum asphalt. The current Indonesia standards require Hot Mix Asphalt incorporating Asbuton (HMAA) to be cured for a few days before it is compacted (scenario 1). The curing duration is aimed to allow softening of the natural asphalt contained in Asbuton. This study investigated a new method of conditioning HMAA (scenario 2). The results showed that the volumetric and Marshall characteristics of HMAA were influenced by the curing time and compaction methods. The findings suggest that the curing method proposed in scenario 2 can be omitted; as such it can speed up the asphalting process. This study found that HMAA can be spread and compacted without curing, with a provision made for the road to be closed from traffic for a minimum of eight days after the compaction is complete.
KEYWORDS
Asbuton, Compaction, Curing Time, Marshall Stability, Volumetric Characteristics, Rock Asphalt
Cite This Paper in IEEE or APA Citation Styles
(a). IEEE Format:
[1] I Dewa Made Alit Karyawan , Ratna Yuniarti , Desi Widianty , Hasyim , Mudji Wahyudi , "Impact Curing Time and Compaction Methods to the Performance of Hot Mix Asphalt Asbuton," Civil Engineering and Architecture, Vol. 10, No. 5, pp. 2054 - 2064, 2022. DOI: 10.13189/cea.2022.100526.
(b). APA Format:
I Dewa Made Alit Karyawan , Ratna Yuniarti , Desi Widianty , Hasyim , Mudji Wahyudi (2022). Impact Curing Time and Compaction Methods to the Performance of Hot Mix Asphalt Asbuton. Civil Engineering and Architecture, 10(5), 2054 - 2064. DOI: 10.13189/cea.2022.100526.